Loading...
Loading...
The characteristic ways contracts fail to achieve their purposes—typically through incompleteness, rigidity, information asymmetry, and enforcement failure. Understanding failure modes enables architectural mitigation.
PPP contracts predictably fail through renegotiation capture, end-of-contract degradation, and rigid technology lock-in. These failure modes are structural—they recur because they're built into contract architecture.
WCF Section 6